100-P-000089-E-02/06.2009
Directional Valve System LVS
5/40
2.2.5 2-stage pressure relief (only in conjunction
with 3-way pressure compensator)
If the pressure in the control line reaches the setting of an
upstream pressure-relief valve, the 3-way compensator
opens to tank, thus limiting the pressure in the pressure gal
lery inside the block.
2.2.6 External priority function, with “Dynamic
Flow” in the LS line
An external actuator always has priority when receiving
supply. Only when the external actuator is already being
supplied with the required flow is any surplus flow then fed
to the valve block. A defined oil flow runs through the LS line
to the priority actuator. This has the effect of shortening the
priority function's reaction time.
2.2.7 LS pressure relief in the priority flow
If the pressure in the control line reaches the LS pressure-
relief setting, the flow to the priority actuator is reduced until
the pressure in the LS line equals the setting of the pres
sure-relief valve. The flow that is no longer required is now
available to other actuators.
2.2.8 Pressure control in P
Direct-acting pressure-relief function in the inlet flow in P.
2.3 Ordering code
Functions
No control function, no ports = CA*
No control function / P, R and LS ports = CAP
LS unloading / P, R and LS ports = CB*
LS
max
pressure relief
1)
(P1=) / P, R and LS ports = CC*
LS
max
pressure relief
1)
(P1=) /
electrical LS-disable via 2/2 seat valve /
de-energised open / P, R and LS ports = CCL
LS
max
pressure relief
1)
(P1=) / LS unloading /
P, R and LS ports = CE*
LS
max
pressure relief
2)
(P1=) / LS unloading/
pressure relief in P (P=) / P, R and LS ports = CD*
3-way compensator / LS unloading / two-stage
pressure relief (P1=) / P and R ports = CF*
3-way compensator / LS unloading / two-stage
pressure relief (P1=) / reduced off-load pressure
(control Δp = 9 bar) / P and R ports = CFE
3-way compensator / LS unloading / two-stage
pressure relief (P1=) / electrical LS-disable via
2/2 seat valve / de-energised open / P and R ports = CFL
2-way compensator / flow cut-off (P1=) /
LS unloading / P, R and LS ports = CF2
.
LVS CF -- E - G1 1 0* J12
Solenoid voltage + sol. connector
AMP Junior Timer, 12 V = J12
AMP Junior Timer, 24 V = J24
Not required for models without elec
trical connections
Port threads to DIN 3852 - Part 2
P and R G1”
LS G1/4”
Priority flow G1/2” = G110
Without threaded ports = ****
A 00/
Design stage
Inlet section
Options (see 2.7)
Pressure
setting in bar
P = ....
P1 = ....
P2 = ....
P3 = ....
Dyn. LS
max
pr. relief in prio. flow
2)
(P2=) / LS
max
pr.
relief in surplus flow (P3=) / external prio. function /
LS unloading / P, PL, R, LS and LSL ports = CG*
3-way compensator / 2-stage pressure relief (P1=) /
mechanical switchover, OC - CC /
LS unloading / P, R and LS ports = CH*
3-way compensator / 2-stage pressure relief (P1=) /
mechanical switchover, OC - CC /
LS unloading / reduced off-load pressure
(control Δp = 9 bar) / P, R and LS ports = CHE
P = pressure setting for the pressure relief in the P inlet
P1 = pressure setting for the LS max pressure relief (inlet presseur = P1+Δp)
1) fixed pressure settings in bar available for the pressure-relief function
(measured at 10 l/min test flow) 25, 32, 40, 50, 63, 80, 100, 125, 140, 160,
175, 190, 210, 230, 250, 280, 300, 330, 350 (for other pressures, consult
Bucher Hydraulics) 2) adjustable pressure
P2 = pressure setting for the pressure relief in the priority flow
P3 = pressure setting for the pressure relief in the surplus flow